Supervision on DEWATS-CBS 2013 in Sumbawa regency, West Nusa Tenggara

Sumbawa, September 15th 2013 – Technical Team Balifokus went to Sumbawa district for construction supervision activities of Wastewater Treatment Plant (WWTP) 2013 SLBM program. This supervision activity conducted for 3 days until the 17th of September 2013 at 6 locations, such as in Berang Bara village, Berang Rea village, Labuan Ijuk village , Jotang village, Mapin Beru village, and the village of Alas Juran. Supervision activities is done to control the progress of activities and advising the handyman / construction worker to be going well and the resulting construction is also good.

The construction in these 6 locations using a conventional construction with masonry – concrete. Current progress of settlement construction in 6 locations of WWTP is only about 10% – 15%. Most are still in the process of making the ground floor and installation of reinforcing steel for concrete. In the process at the field is found that most of the problems are the workmanship of the builders / construction workers are less appropriate to the design of the design have been made such as the manufacture of concrete, steel mounting distance, and installation of brick that are not appropriate. This supervision activities is expected the errors and discrepancies with the design and construction technical drawings can be reduced.

Figure 1 and 2: Situation during Construction Supervision at the KSM Tiram Topat, desa Labuhan Ijuk, kecamatan Moyo Hilir – kabupaten Sumbawa. (Photo Credit: Dwi Ariantara)

Figure 3 and 4: Situation during Construction Supervision at the KSM Tunas Muda, desa Mapin Beru, kecamatan Alas Barat – kabupaten Sumbawa.(Photo Credit: Dwi Ariantara)

Featured Posts
Recent Posts
Archive
Search By Tags

© 2019 by Nexus3/BaliFokus Foundation

All Rights Reserved

​​Call us:

+62-361-233520

​Find us: 

Mandalawangi 5, Jln. Tukad Tegalwangi, Sesetan

Denpasar 80223 Bali - INDONESIA